The Ravine Lift Station is on the south side of the Parkway (Hawthorne Ave.), between the waterfall and the beach. The Lift Station was originally constructed in the 1930s on the original Wastewater Treatment Facility's site.
The Ravine Lift Station collects from:
The lift station has a force main that discharges into a man-hole on 3rd Ave. and Marshall Ave., which then flows by gravity to the current Wastewater Treatment Facility on 5th Ave.
The project will include:
The anticipated timeline for the completion of the project is September of 2022.
Phases include: